Due
Diligence
-Transaction Screen
-Phase I Environmental Site Assessment / All Appropriate Inquiry
(Raw
Land, Residential, Commercial, Industrial, etc.)
-Phase II ESA
-Affected Property Assessment Reports (APAR)
-Texas Risk Reduction Program (TRRP) Consulting
-Brownfield Assessments
-Environmental Assessments
-Voluntary
Cleanup Program (VCP) Consulting
Geoscience
-Geologic Assessments
(Development,
Karst Features, etc.)
-Subsurface Investigations
(Soil,
Groundwater, Tracer Studies, etc.)
Natural Resources
-NEPA Reviews
(Categorical
Exclusion, Environmental Assessment, FONSI, etc.)
-Environmental Impact Statement (EIS) Project Management
-Tree Surveys
-GIS mapping and analysis
-Endangered Species Act / Migratory Bird Treaty Act
-Biological Assessments
-Habitat
Conservation and Planning
Cultural Resources
-Tribal / Native American Consultation
-National Historic Preservation Act
-Antiquities Code of Texas
-Archeological Project Management
-Texas Historical Commission (SHPO) Cell Tower Review Process
Remediation
Planning and Oversight
Wastes, Emergency Planning and Community Right-to-Know
-Potentially Responsible Party (PRP) Consulting
-EPCRA TIER II Inventory Reporting
-Risk Management Plans
-Classification and Coding of Wastes
-Special Waste Management
-Waste Generator Permitting, Reporting and Compliance
-Solid Waste Management Unit Closure Process
-Dry Cleaner Registration, Reporting and Compliance Consulting
-Used Oil Generator, Collection Center and Handler/Transporter
-Universal Waste Management and Inventory
-Recyclable Materials Mangement, Registration and Reporting
-Construction and Demolition Debris Management
-Composting and Mulch Management
-Medical Waste Management
|
Regulatory
Agency Inspection and Enforcement Assistance
-Internal
Comprehensive Environmental Audits
-Representation for Regulatory Agency Inspections
-Texas E,H&S Audit Privilege Act Consulting
Water Permitting, Delineation and Compliance Testing
-Storm Water Permitting (Industrial, TXR050000, etc.)
-Water Quality General Permits (CAFO, TXG830000, etc.)
-MS4 Phase II (TXR040000) Permitting
-Construction Storm Water Permitting (TXR150000)
-Waste Water Permitting (TXG110000, etc.)
-Water Sampling for Public Water Systems
-Groundwater Classification (for consumption, irrigation, TRRP,
etc.)
-Edwards Aquifer Water Pollution Abatment Plans (WPAP)
-Water of the State/US Determinations
-USACE 404 Permitting (Nationwide Permits, etc.)
-Wetland Delineation Project Management
Air
Permitting, Reporting and Compliance Testing
-De Minimis, Grandfathered and Standard Exemption Source Review
-Permits By Rule (PBR) Authorizations
-Standard Permits
-New Source Review (NSR) Permits
-Nonattainment Permits
-Flexible Permits
-Relocation or Change of Location for Portable Equipment
(Rock
Crushers, Concrete Batch Plants, Generators, etc.)
-Air Dispersion Modeling
-Best Available Control Technology (BACT) Review
-Local Air Pollution Control Program Compliance
-Air Quality Research
-Federal New Source Performance Standards (NSPS) Testing
(Visible
Emissions, Stack Test Project Management, etc.)
-Annual Air Emission Inventory
-Asbestos Project Management
-Indoor Air Quality and Mold Investigation Project Management
-Toxic Release Inventory (TRI) Reporting
Petroleum Storage Tanks (PST)
-Registration
-AST Inspections (SP001)
-Spill Response and Release Reporting
-Federal SPCC Plan Development and Implementation
Training
-Multi-Media Environmental, Health and Safety Compliance
Training
Health and Safety
-Health and Safety Plans
-OSHA reviews |